Leak in Moragahakanda Reservoir dam

Leak in Moragahakanda Reservoir dam

January 2, 2020   11:53 am

A leak has been observed in the upper corner of the main dam of the Moragahakanda Reservoir for several days as the maximum water capacity of the reservoir had reached.

Director of Moragahakanda Kalu Ganga Reservoir Project PB Wijeratne stated that engineers from a Chinese company have already taken measures to halt the leak.

However, this should not cause any fear or worry as the leak would not cause much damage to the reservoir of the dam, he pointed out.

He further said that the aforementioned Chinese company will constantly look into and be completely responsible for the matters of the reservoir, and the payments will be made only after that. Subsequently, the dam will be handed over to Sri Lanka, Wijeratne added.

The Director further said that the Chinese company has already planned to repair the dam as soon as the water level drops.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

Immigration Controller General pleads guilty to contempt of court charge (English)

Seat belts mandatory for passengers of all vehicles on expressways from September (English)

Fuel prices increased (English)

Former Minister Gamini Lokuge passes away (English)

Public react to increase in fuel prices and 0.55% reduction in bus fares

LIVE🔴 Ada Derana Prime Time News Bulletin 6.55 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm