Kaduwela-Biyagama Bridge to be closed

Kaduwela-Biyagama Bridge to be closed

May 24, 2018   05:41 pm

The bridge connecting Kaduwela and Biyagama will be closed from 10.00pm tonight to 5.00am tomorrow (25) as a precautionary measure, Police said.

Traffic had been restricted on the bridge yesterday (23) due fears over the excessive erosion of soil underneath the bridge along the Kelani River banks.

Vehicle movement along the bridge was limited to one lane yesterday, however it was later opened for traffic. 

The Road Development Authority (RDA) had dispatched a team of engineers to the location to inspect damage caused by the heavy erosion which was triggered by the adverse weather.  

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

President Dissanayake assumes duties as Minister of Defence (English)

Pilleyan arrives at CID again to record statement (English)

MP Dilith Jayaweera calls on Malwathu Mahanayake Thero (English)

Sri Lanka says discussions with IMF on third review concluded successfully (English)

LIVE🔴Ada Derana Prime Time News Bulletin 6.55 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

New Speaker and Deputy Speaker appointed during inaugural session of 10th Parliament (English)