Unit 1 of Norochcholai power plant resumes operations

Unit 1 of Norochcholai power plant resumes operations

August 27, 2022   08:40 am

Unit 1 of the Lakvijaya Power Plant in Norochcholai, which remained inoperative since last week, resumed operations last evening (Aug 26), the Ceylon Electricity Board (CEB) says.

The generator, which was initially expected to be restored by Monday (Aug 29), has added 300 megawatts of electricity to the national grid after recommencing functions.

On August 15, Power & Energy Minister Kanchana Wijesekera announced a breakdown in Unit 1 of the Norochcholai power plant. The national grid lost 270 megawatts of electricity as a result.

Owing to the malfunction, the duration of daily power interruptions was also extended to three hours.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

Prime Minister Harini joins Chinese New Year celebration in Colombo (English)

Minister criticizes lack of commitment to address port congestion (English)

Gal Oya river bunds breach in Nena Kaadu (English)

Mahinda Rajapaksa is ready to vacate Colombo residence at any time – Namal (English)

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

'We will take over ex-President Mahinda's residence and provide a third of his salary' – President AKD