Second generator at Norochcholai plant to be added to national grid

Second generator at Norochcholai plant to be added to national grid

October 23, 2022   06:57 pm

The second generator at the Norochcholai Coal Power Plant, which had been shut down due to maintenance activities, has now been restored and will be reconnected to the national grid today (Oct 23), an official said.

The President of the Engineers’ Association of Ceylon Electricity Board (CEB), Nihal Weeraratne stated that the maintenance work of the power plant has now been completed.

Accordingly, the electricity capacity of 270 Mega Watts generated by the power plant will be gradually added to the national grid.

After reconnecting the second generator to the system, the third generator of the Norochcholai power plant is scheduled to be shut down for maintenance work as well.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

''We will not rest until Sri Lanka is turned around'' - Tilvin Silva (English)

High-level talks held with US to minimize impact of Trump's tariffs - Finance Deputy Minister (English)

'India has been a true friend at every step of Sri Lanka's development'' - PM Modi (English)

LIVE🔴 Ada Derana Prime Time News Bulletin 6.55 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

President Dissanayake needs to rectify JVP's mistake first – MP Dilith Jayaweera (English)

President Dissanayake and Indian PM Modi hold high-level bilateral talks (English)