Special team to evaluate Norochcholai Coal Power Plant

Special team to evaluate Norochcholai Coal Power Plant

July 19, 2017   08:47 am

Minister Ranjith Siyambalapitiya has ordered the appointment of a team of specialized engineers for the purpose of investigating the functioning of generators of the Norochcholai Coal Power Plant.

A source from the Ministry of Power and Renewable Energy stated that the appointed engineers would be examining the generators’ functioning throughout the day.

The source also mentioned that the third generator of the power plant would be restored back to its normal functions during the course of the next few days.

Measures were taken previously to terminate the functioning of the third generator owing to a malfunctioning of the steam transport network.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

LIVE🔴 Ada Derana Prime Time News Bulletin 6.55 pm

LIVE🔴 Ada Derana Prime Time News Bulletin 6.55 pm

2024 General Election: Latest situation in Colombo District as voting continues

How to correctly cast your vote at the 2024 Parliamentary Election (English)

2024 Parliamentary Election: Ada Derana prepared for comprehensive coverage (English)

LIVE🔴 Ada Derana Prime Time News Bulletin 6.55 pm

LIVE🔴 Ada Derana Lunch Time News Bulletin 12.00 pm

Substandard medicine imports: Court orders to record statements from 18 former Cabinet members (English)