Breakdown reported in a power plant at Norochcholai

Breakdown reported in a power plant at Norochcholai

May 3, 2022   12:12 pm

The Ceylon Electricity Board (CEB) has informed of a technical breakdown in one of the power plants at Norochcholai, Minister of Energy Kanchana Wijesekera.

The national grid loses a total of 270 MW as a result of the breakdown.

Minister Wijesekera stated that repairs are under way at present. He assured that the power plant in question will be reconnected to the national grid within a period of five days.

However, no further extensions will be made to the rolling power interruptions owing to the situation, he added.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

Ada Derana Lunch Time News Bulletin 12.00 pm

Ada Derana Lunch Time News Bulletin 12.00 pm

Education system cannot be transformed overnight PM presents her case for reforms (English)

Sri Lanka's Education Reforms: Education sector stakeholders have their say (English)

Showery conditions across Sri Lanka subsides; A/L Exams to resume tomorrow (English)

Implement education reforms after comprehensive two-year study; Maha Sangha tells PM (English)

LIVE🔴 Ada Derana Prime Time News Bulletin 6.55 pm

Ada Derana Lunch Time News Bulletin 12.00 pm

Death toll in Galenbindunawewa house fire rises as 15-yr-old girl succumbs to injuries (English)