Breakdown reported in a power plant at Norochcholai

Breakdown reported in a power plant at Norochcholai

May 3, 2022   12:12 pm

The Ceylon Electricity Board (CEB) has informed of a technical breakdown in one of the power plants at Norochcholai, Minister of Energy Kanchana Wijesekera.

The national grid loses a total of 270 MW as a result of the breakdown.

Minister Wijesekera stated that repairs are under way at present. He assured that the power plant in question will be reconnected to the national grid within a period of five days.

However, no further extensions will be made to the rolling power interruptions owing to the situation, he added.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

Office train services to resume as normal tomorrow; Private bus operations reduced (English)

Office train services to resume as normal tomorrow; Private bus operations reduced (English)

Derana-Dialog 'Rangiri Dambulu Soorya Mangalya' draws massive crowds in Dambulla (English)

Customary anointing of oil for New Year performed at temples across the island (English)

🔴LIVE | Ada Derana Lunch Time News Bulletin 12.00 pm

Sri Lanka's Aging Population; 2024 Census reveals demographic trends and socioeconomic impacts (English)

Sri Lankans ushered in Sinhala and Tamil New Year with customs and festivities across the country (English)

President welcomes New Year with residents of newly rebuilt home damaged by cyclone (English)

🔴LIVE | Ada Derana Prime Time News Bulletin