Breakdown reported in a power plant at Norochcholai

Breakdown reported in a power plant at Norochcholai

May 3, 2022   12:12 pm

The Ceylon Electricity Board (CEB) has informed of a technical breakdown in one of the power plants at Norochcholai, Minister of Energy Kanchana Wijesekera.

The national grid loses a total of 270 MW as a result of the breakdown.

Minister Wijesekera stated that repairs are under way at present. He assured that the power plant in question will be reconnected to the national grid within a period of five days.

However, no further extensions will be made to the rolling power interruptions owing to the situation, he added.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

President reviews post-Ditwah recovery in Badulla; Land, housing issues deliberated with officials (English)

President reviews post-Ditwah recovery in Badulla; Land, housing issues deliberated with officials (English)

Adverse weather wreak havoc across Sri Lanka; Heavy rains to continue, over 1,000 families affected (English)

Kapila Chandrasena Death Inquiry: No footage found from CCTV system at Aravinda de Silva's residence (English)

🔴LIVE | Ada Derana Prime Time News Bulletin

Ada Derana Lunch Time News Bulletin 12.00 pm

Sri Lanka's fuel import costs surge nearly six-fold amid ongoing Middle East conflict - President (English)

Low-pressure system northeast of Sri Lanka to weaken within 48 hours - Met. Dept. (English)

MP Mujibur Rahman accuses govt. of unequal application of law (English)