Breakdown reported in a power plant at Norochcholai

Breakdown reported in a power plant at Norochcholai

May 3, 2022   12:12 pm

The Ceylon Electricity Board (CEB) has informed of a technical breakdown in one of the power plants at Norochcholai, Minister of Energy Kanchana Wijesekera.

The national grid loses a total of 270 MW as a result of the breakdown.

Minister Wijesekera stated that repairs are under way at present. He assured that the power plant in question will be reconnected to the national grid within a period of five days.

However, no further extensions will be made to the rolling power interruptions owing to the situation, he added.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

President directs officials to calculate compensation in an orderly and fair manner (English)

President directs officials to calculate compensation in an orderly and fair manner (English)

Revised school timetable announced; A/L exam to resume on Jan. 12, O/L as scheduled (English)

Northeast monsoon conditions established over the island; heavy rains expected in several areas (English)

Sri Lanka continues to receive global support for ongoing disaster relief operations (English)

Ada Derana Prime Time News Bulletin

🔴LIVE | Ada Derana Midday Prime News Bulletin

More aid delivered to cyclone-hit regions through ‘Manusath Derana’ relief drive (English)

DMC urges people to remain at safety shelters until officials complete security assessment (English)